Riverside energy from waste emission reports

Our riverside facility has been operating within all air pollution limits since it opened in 2012. We are committed to being as transparent as possible, and we publish emissions data on a monthly basis.

The Green Highway

By using the ‘Green Highway’ of the Thames, we remove 100,000 truck journeys from London’s roads each year, reducing congestion and improving pedestrian and cyclist safety. It also saves around 13,500 tonnes of CO2 compared with road-based waste transport. Watch this video to find out more.